Numerical analysis about low embankmentfoundation response under traffic load was developed.
开展了交通荷载作用下低路堤高速公路路基响应的数值计算工作。
2
The result proved that the embankmentfoundation excavation was smooth and the houses nearby haven't any displacement and dropping appearance.
经实施,堤基开挖顺利,附近房屋无任何位移与沉降迹象。
3
High fill embankmentfoundation settlement calculations, without considering the construction process, the calculated results with field test results there is a big difference.