The model of top driving device when starting drilling was established and the continuous flexible module of slide-way was integrated and a tentative simulation and analysis were also made.
建立了顶驱装置开钻时的模型,并集成了导轨连续柔性模块,做了初步的仿真和分析。
2
The results could provide references for the design and development of TLP moduledrilling rig.