We had adopted three methods to predict the area of the reservoir bankslump. At last, we comparatively analysed the three calculations to determine the final area of slump shore.
本文采用三种方法进行坍岸范围预测,将三者预测的结果对比分析,得到了不同松散堆积体最终的坍岸范围。
2
In Three Gorges area, the No. 3 geologic hazard prevention involves 44 engineerings about reservoir bank. And the bankslump prediction is the very important basis of reservoir bank regulation design.
三峡库区三期地质灾害防治工程涉及到库岸的工程有44处之多,而塌岸预测是库岸整治设计的重要依据。
3
The crisis ended-and the bottom of the slump was reached-only with a federal bank holiday, declared by Roosevelt within days of taking office.