The UK alone has 10, 000 tons of nuclear waste, a pile which will increase 25-fold when the existing plants are decommissioned, with no solution in sight other than deep burial.
The ore belts, mining area, deposits and ore-bodies are all controlled by the deep faults, large scale shear zones and the fold and fault-crack system aside.