Alternatively, a cycle can begin in a separate output criterion of an activity and end in a separate input criterion of this or another activity.
另外,循环也可以从活动的单独输出条件开始,并在该活动或其他活动的单独输入条件中结束。
2
On this basis, the failure criterion of concrete simultaneously considering the freeze-thaw cycle and tension-compression ratio in principle stress space and octahedral space is established.
The criterion to estimate the above relationship was presented, which was then used to analyse the relationship between Capacity and cYcle length for a signalized intersection as a whole.