The announcement was made at the second annual Summit of Information Specialists in Particle physics and Astrophysics held at DESY on May 20th and 21st.
In order to get some experience to build a new modulator for DESY TESLA Test Facility (TTF), a 150v direct switch long pulse modulator has been designed.