According to the seepage problems of Longhuai dam body and its geological conditions, the plastic concrete cutoff wall seepage was adopted to obtain better effect after scheme comparison.
龙怀水库坝体存在渗漏问题,根据工程地质条件通过方案比选,采用塑性砼防渗墙防渗,防渗效果较好。
2
To consider the effect of low-cutoff energy of non-thermal electrons, it is necessary to calculate with more strict theory of gyro-synchrotron radiation.
为了考虑非热电子低能截止的影响,必须采用更严格的回旋同步辐射理论来计算。
3
The effect on seepage is small when the opening of cutoff wall crack is less than0.3cm themaximum relative water head at the bottom of lower core wall is only2.02%.