The initial coreloading program, nuclear safety and nuclear monitoring during the coreloading and temporary instrumentation system for Qinshan NPP is described.
本文介绍秦山核电厂首次装料程序、装料中的核安全与核监测,以及装料试验用的临时核测仪表和设备。
2
The initial coreloading test indicated that overall planning and careful preparing before loading test is basic to success this test. Test results agreed with acceptance criteria.
首次装料试验结果表明,仔细筹划、充分准备是装料试验成功的基础,试验结果满足验收准则。
3
Designed a long period (18 months) low - leakage balance cycle coreloading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.