Research conclusions: With the trains being-speed up, the transient pressure of double-tracktunnel in the existing railway can not reach the standard of comfort.
研究结论:提速后,我国既有线上一些双线隧道的瞬变压力不能满足旅客乘车的“舒适度”标准。
2
Using the continuous elastic double layers beam model of track structure, the forces between the sleepers and the tunnel inlay produced by the running of certain subway train were calculated.
A description is given to method and technology adopted against track deviation during construction of elastic monolithic track bed in long double line tunnel.