Introduces OCS construction transitional plan such as railway line-moving, line-crossing and side-exchanging, bridge and track laying, station closing up etc. on Zhuzhou-Liupanshui double track lines.
介绍了株六复线改造因线路拨移、线路交叉换侧、桥梁铺架、车站封闭等引起接触网施工方案的过渡。
2
Such algorithm is applicable to regular, irregular, single track and doubletrack train operation diagrams, and can solve conflict problems of operation line in a short period.
该算法适用于周期、非周期、单线和双线列车运行图,能在较短的时间内解决运行线的冲突问题。
3
A great amount of post tensioned pre-stressing concrete single box beam for doubletrack (as called the box beam hereinafter) has been used on the line.