Between eight and ten patients with severe spinal-cord injuries will be recruited to test this treatment for safety.
为了安全,有8 - 10个严重脊髓损伤的患者将纳入治疗试验。
2
The Dielectric Strength Test is to be performed between each pair of conductors (including ground if applicable) and between each conductor and the foil wrapped cord guard.
电介质强度试验是在每对导体(包括地)之间和每个导体与包装了金属薄片的尾档之间测量。
3
The cord set completed required cycles of flexing with no occurrence of end results and also successfully completed the Dielectric Strength Test without breakdown.