释义 |
- 1
After finish paving hutch defends floor tile, look at the floor drain the water should check whether the drainage smooth, to remove floor drain cover drainage speed shall prevail. 铺完厨卫地砖后应该放水检查,看看地漏排水是否顺畅,以去掉地漏上盖后的排水速度为准。 - 2
Wall brick, floor tile in the post, before bubble water must enough time. At the same time will use item floor drain plug well, prevent cement fall blocking drains. 墙砖、地砖在贴之前,泡水时间一定要够。同时要将地漏用东西塞好,防止水泥掉下去堵塞下水道。 - 3
Kitchen floor tile stick good who didn't dry before had better measure level is low, see in a floor drain, if not, immediately, cannot rework 'heart. 卫厨地砖贴好没干前最好量一下水平,看最低点是不是在地漏处,如果不是,立即返工,不能心软。
|