After finish paving hutch defends floor tile, look at the floor drain the water should check whether the drainage smooth, to remove floor drain cover drainage speed shall prevail.
铺完厨卫地砖后应该放水检查,看看地漏排水是否顺畅,以去掉地漏上盖后的排水速度为准。
3
Wall brick, floor tile in the post, before bubble water must enough time. At the same time will use item floor drain plug well, prevent cement fall blocking drains.