Storm sampling method is often annual multisampling method in urban drainageengineering.
但是,城市排水短历时设计暴雨、选样方法采用的是年多个样值。
2
It is pointed out that underground drainageengineering should be the main measure in pebbly-clay landslide control.
指出在含碎石黏性土滑坡的防治中,应将地下水排水措施作为主要防治措施。
3
The article mainly to the building water supply and drainageengineering construction quality control measures are analyzed, in order to offer reference to colleagues.