For construction practice, the paper analysed some problem in waterproof, drainage design and construction of freeway communication conduit, proposed some methods for solving the problem.
Stem steam leakage from main stop valve and governor valve, drainage of front and rear steam sealing, etc shall all be directed into the conduit, and then be discharged into the gutter.