NJU automatic controllers used for the preheating boiler and converterunit of diesel locomotive are developed for the replacement of the similar equipment in V_(1003) and V_(100) diesel locomotives.
The application we will create will be a simple unit-converter application.
我们将创建的应用程序是一个简单的单位转换应用程序。
3
Normal production conditions, often open the two Taiwan screw compressor and a piston compressor, mainly for converter, rolling and tropical in three production unit of gas supply.