The process optimization for No. 3 Billet Caster at ConverterPlant which improves the production stability and strand quality has been introduced.
介绍转炉炼钢厂优化3号方坯连铸机的生产工艺,使生产稳定性提高,铸坯质量得到改善。
3
The concrete conditions about the steam retrieve and the way of ensuring the steam to attain the required standards in the converterplant of Nanchang Iron and Steel Company were introduced.