In the foundation treatment for the converter of main plant building of large scale steel mill, it is the first time to replace conventional pile foundation design by grouting technique.
在大型炼钢厂转炉主厂房的地基处理上,首次引进注浆技术取代常规桩基设计。
2
To introduce the trial production process of ML08Al cold heading steel adopting the process of converter steel-making, LF refining, billet continuous cast and high speed wire rod mill.
介绍采用转炉、l F炉精炼、小方坯连铸机、高速线材轧机生产工艺试制ML 08 A l冷镦钢的过程。
3
The advanced development process flow of "converter-small billet continuous casting machine-high speed wire rod mill" is adopted in developing EH14 wire rod for weld.