In Yangtze diversionworks, Phase III, the land-based reservoir will be constructed by excavation.
长江引水三期陆域水库库区采用开挖成库形成库容。
2
Songshan concrete face rockfill dam is the head project of Songshan diversionworks for Songjianghe water power station.
松山混凝土面板堆石坝是松江河水电站松山引水枢纽头部工程。
3
In the construction of barrage diversionworks on alluvial rivers with heavy sediment load, complete systematic experience and design criteria are still lacking.