While not directly related to using lsof, a brief diversion to the /proc directory is in order.
尽管与使用 lsof 没有什么直接的关系,但对 /proc 目录进行简要的介绍是有必要的。
2
In order to monitor project's safety status of every section it is designed to arrange some interrelated instruments at slope dam spillway and diversion tunnel.
为了监测各工程部位安全状态,设计分别在边坡、坝、洪道、流洞等工程部位布置了相关观测仪器。
3
Finally, opening the flood diversion work's gate is through blasting or manpower, and the open order influences the discharge and elevation of water in main river.