BPR have a striking effect in the quality controlofsignal sickness.
因而住院流程重组在单病种质量控制中效果明显。
2
As the probe is 320 million km away from Earth, there is a signal delay of over 10 minutes if the research team tries to control it from Earth.
由于探测器距地球3.2亿公里,如果研究小组在地球上控制探测器,会有10分钟以上的信号延迟。
3
It is possible that threads are spawned in a process by other participating entities outside the controlof the application and it might not be possible to control their signal masks.