During the execution of the Works, the Contractor shall keep the Site free from all unnecessary obstruction, and shall store or dispose of any Contractor's Equipment or surplus materials.
This procedure aims to provide the general guideline on managing the DSPC contractor's PPE and other contractor borrowed safety materials.
此程序旨在提供一套规范苏州杜邦公司承包商个人防护用品及其他安全用品的管理方法。
3
The Employer shall not at any time be liable, save as mentioned in Clauses 20 and 65, for the loss of or damage to any of the said Contractor's Equipment, Temporary Works or materials.