Pressure pumped CFG pile by continuousauger drilling is a new technology of CFG pile composite foundation.
长螺旋钻管内泵压CFG桩,是一项CF G桩复合地基新技术。
2
An auger is positioned within the chamber for moving crumb which has been charged to the chamber in a substantially, even, continuous manner along its horizontal longitudinal axis.