This paper introduces the construction method for extension of caissons in winter during the rehabilitation of the containerberth in the west port basin in Qinhuangdao port.
介绍秦皇岛港西港区集装箱泊位改造工程沉箱接高冬期施工工艺。
2
At the end of 2008, the first 50,000-ton containerberth of Gaolan port was put to trial. It symbolized the key step forward in transition from a feeder port to a trunk line port.
2008年底,高栏港第一个5万吨级集装箱泊位试航,标志着高栏港由喂给港向干线港转变迈出了关键一步。