However, software test is a complex process; it needs to consume huge manpower, material resources and time, which takes the 40%-50% of entire software development cost approximately.
The new technology is more simple, which shorten produce period and reduce power consume and manpower cost.
新工艺过程更加简洁明了,缩短了生产周期,降低了动力消耗与人工成本。
3
Not only that transports these grain the domesticated fowl the transportation which the meats must consume the petroleum the manpower and so on resources we are far from conceivable.