The pit ultimately reached 6.5 meters, and we found several construction episodes that date to the earliest occupation of the site.
这个坑最终达到了6.5米,我们发现了好几个可追述到此遗址最早居住时期的建筑片段。
2
The numerical simulation procedure by this method is presented on the construction procedure of a pit.
用该方法对基坑施工的工程进行了数值模拟。
3
ANSYS software has been applied successfully in construction of deep foundation pit excavation in Shanghai South Station reconstruction project of Shanghai Metro Line No 1.