The application of the middle line method of dam construction and the tailing transportation using water isolation pumps are an effective way.
采用大坝中线法施工,采用隔水泵输送尾矿是一种行之有效的方法。
2
However, the constructionof the second Inga-Kinshasa line will be financed by the European Investment Bank (EIB).
第二条因加-金沙萨线路的建设将由欧洲投资银行资助(EIB)。
3
First, the Federal Energy Regulatory Commission has guaranteed a high rate of return on the constructionof the multibilliondollar line, which will be paid for by ratepayers.