Non-payment of wages on in front of us, but as a conditionof Second Construction workers are still waiting for long.
不付工资就摆在我们面前的,而是作为一个条件,第二个建筑工人仍在等待太久。
2
The design, construction and operating conditionof grounding equipment affect not only safety operation of power system but also electromagnetic interference of substation.
接地装置的设计施工及运行情况的好坏不仅影响电力系统安全运行,也是影响变电站电磁干扰的重要方面。
3
Thirdly, strengthen the conditionconstruction to improve ability of information management.