The each time parameter of constructionschedulenetwork planning in the graph may be exposed immediately, the total float and the free float of each work especially.
图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。
2
Abstract: Based on the constructionschedulenetwork planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to constructionschedule.
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
3
Template processes in many cases network diagram of the construction of the key lines, Process Improvement template can often speed up the construction schedule.