Modern straw buildings start with a foundation of gravel held in the kind of plastic bags used for vegetables at a grocery store, and covered with a soil mortar.
现代稻草建筑是以食品店包装蔬菜用的塑料袋以碎石作为基板,上面铺一层灰泥浆。
2
Precast pile driving test is performed to investigate its possibility in gravel pile composite foundation with settling tube.
为了研究在沉管碎石桩复合地基场地中沉入预制桩的可能性,进行了预制桩沉桩试验。
3
The application and the design calculation methods of composite foundation with gravel pile and CFG pile based on engineering practice are analyzed, and the rational calculation methods are presented.