The reserve calculation methods used in the production units at present are mainly the traditional ones based on solid geometry, namely cross-section method or geological block method.
目前,在实际生产单位所采用的储量计算方法主要是基于立体几何的传统方法,即剖面法或地质块段法。
2
Research purposes: Jiaozhou Bay Tunnel is needed to cross the seabed fault zone, but a little survey geological data are obtained because of the means limitation of engineering survey.
Integrating the inter-well parameters prediction methods with cross-check method, Kriging interpolation method proved to be the most ideal geological interpolation method.