At the same time, compute all the path criticalities by utilizing the relationship between the critical path of interval networks and the path criticality of the fuzzy network as well.
同时利用截集区间网络关键路径与模糊网络关键度的关系,计算出所有路径的关键度。
2
The algorithm relied on simple table lookups for performing the computationally critical operations of interval subdivision.
该算法采用简单的查表法来完成区间再分割中的计算关键性运算。
3
A small fracturing treatment performed before the main hydraulic fracturing treatment to acquire critical job design and execution data and confirm the predicted response of the treatment interval.