Firstly, according to physical character and engineering operation condition of earth dam, main invalidation modes about earth damengineering are investigated.
根据土石坝的物理特征以及工程运行实际,研究了土石坝工程的主要失效模式。
3
These DAMS, similar to the previously reported case histories, were selected based on a number of factors which led to their significance to the damengineering profession.