Unacceptable material or equipment is isolated and marked. No non-conformed material is issued for construction. Detail inspection record of damaged and unqualified material or equipment is provided.
If we find any damaged cargo during discharging, shall we discharge it ashore or leave it on board for your inspection?
如果在卸货过程中发现残损,我们将货卸到岸上还是留在船上等你验看。
3
Durability inspection and safety evaluation were made to a damaged coal mine shaft tower due to the corrosion of rebar in concrete, and the corrosion mechanisms of rebar in concrete were analyzed.