To reduce resistance from the suction section of pump, the water pump must be installed at the condenserinlet of air conditioner.
为减小泵的吸入段阻力,水泵必须装在空调机冷凝器进口。
2
The tail gas outlet nozzle should be tangential to allow gravity flow of the sulfur form the waste heat boiler to the inlet channel of the downstream sulfur condenser.
尾气出口喷嘴宜为正切向,从而使的来自余热锅炉硫的重力流流入下游硫冷凝器的入口通道。
3
With the increase of inlet air temperature of the condenser, evaporation pressure, condensation pressure increase, but supercooling and superheat degree, refrigerating capacity and COP decrease.