In this stage, the lifting frame was fixed to a hook attached to a crane, and the hull was lifted completely clear of the seabed and transferred underwater into the lifting cradle.
在这一阶段,吊架固定在吊车的挂钩上,船体完全脱离海床,在水下被转移到吊篮里。
2
Top it off with the wooden crane with hook and swiveling action.
顶它关闭的木制起重机吊钩和旋转动作。
3
The paper introduces the application of PLC in titanium smelting crane, in particular, the rising up and descending down of main hook by PLc.