The corroded steel bar may result in the decrease of bearing capacity of reinforced concretemember.
锈蚀的钢筋会导致混凝土构件的承载力下降。
2
The process of prestressing consists in applying forces to the concrete structure by stressing tendons relative to the concretemember.
预应力全过程主要包括通过向与混凝土构件有关的筋施压从而达到向整合混凝土结构施加压力的目的。
3
The lower enveloping curve of the shear strength control zone can be found from the analysis of shear and flexural strength of reinforced concretemember.