An entire model simulating concrete construction process in combination with the concretepouring without longitudinal, joints of the Three Gorges Project spillway dam is established.
对三峡工程泄洪坝段混凝土通仓浇筑,建立了模拟混凝土施工过程的整体模型。
2
On the basis of above study, we make risk treatment analysis and present concrete risk depending measures for pouringdam construction in GongBoXia project.
根据以上分析研究,运用风险应对策略,为公伯峡堆石坝填筑施工风险防范提出具体措施。
3
So it is necessary to carry out risk analysis and risk management in pouringdam construction to display the virtues of concrete faceplate rock dam and to construct quickly.