The design methods include how to select bedload and bedmaterial within the suspended load and how to determine the feed of the model sand and the time of the experiment.
模型设计方法主要包括:如何合理选择模型河床质和床沙质,如何确定进口断面加沙量和放水时间等。
2
The river channel change, the bedload and bedmaterial armoring, and the water level lowering after the operation of the Gezhouba project are analyzed based on the topographic and hydrologic data.