In installation, the positioning axis of the foundation and the bearing steel cylinder elevation exceed the allowable value of the standard deviation.
在安装方面上,基础的定位轴线和支承钢柱面标高超过规范允许偏差值。
2
Power and non power shaft bend and adjust the pressure, and together with the roller disk axisdeviation have been reflected in the design.
动力和非动力轴的弯度和调整压力,以及连同滚筒盘中的轴的偏差在设计中都得到体现。
3
Analyzes the deviation genesis of centering the axis of hydraulic generator and water turbine, brings forward the coaxiality method, which works well in practical application.