Check the dimensions of dug pipe channel, especially the grade level, inclination against design requirements, check to see whether the bedding is rammed hard enough.
检测开挖的管槽尺寸,特别是水平高程、斜度是否满足设计要求,垫层是否夯实。
2
So, the adoption of rigid or flexible connections to pipe joints and pipebedding, as well as the scheme of ground base treatment matched with rigid foundation ar.
该文提出管道接口与管基采用刚、柔性连接和与刚性相匹配的地基处理方案进行防治,以策安全运行。
3
Meanwhile, the pipe-roof grouting and pile anchoring method have been adopted also to strengthen the bedding strata of the large span tunnel.