The design of the compoundpile foundation of the Shanghai Middle School Gymnasium is introduced.
介绍了上海中学体育馆微型桩复合基础的设计情况。
2
To construct the compoundpile diaphram using bored piles and jet -grouted piles, and related techniques is an important approach to reinforce the pit wall and protect the building.
采用钻孔灌注桩、高压旋喷桩及相应配套技术建造混合桩连续墙是边坡加固、保护建筑物的一项重要手段。
3
The pageant took place in the compound immediately behind Freetown’s main ministerial pile which boasts an erratic elevator and apocalyptic lavatories.