The former is characterized by the ability to know requirements with surety in advance, thereby making deterministicscheduling possible.
前者的特征是确保具有提前了解需求的能力,因而可以制订确定性计划。
2
To schedule deterministic pauses for GC, Metronome USES two different threads to achieve both consistent scheduling and short, uninterrupted pause times.
In this paper, the deterministic model of cascaded hydropower station optimal scheduling is compared with the stochastic model, and the deterministic model is mainly researched.