The text expatiate the tenet and method that should be follow to control project cost during pre design and detaileddesignforconstruction section.
阐述了在初步设计和施工图设计阶段控制工程造价应遵循的原则与方法。
2
From tunnel structure, cross section design, structure design, construction method and other aspects detailed discussion is made, which provide references for related works in the future.
Detailed implement rules of soil and water conservation monitor for development and construction projects is the further design of soil and water conservation plan.