The stripe coat must be applied prior to full coat on the erection joints, marker of tanks, water line, draftmark, ship name and port register etc of shell plate.
外壳上的焊缝、舱室标记、水线标记、水尺、船名、港籍名等每一度涂层施工前均要做预涂;
2
Adjust bust point. Trace off form the draft, add seam allowances. Notch and mark drill hole for DART point.