Proceed with the robot's move qualification, analyse and study the capsizal capability.
从履带式机器人的行走必要条件入手,对其抗倾覆能力进行了分析与研究。
2
Unreasonable design project can arose the capsizal of tower crane in building its base on soft soil foundation, and it will also increase the construction cost.