The disposaloperation delayed a passenger train en route from Ukraine to Azerbaijan by several hours.
拆除行动使得一趟从乌克兰开往阿塞拜疆的客运列车延误了数个小时。
2
By contract risk evaluation, risk disposal ability evaluation and risk strategy cost calculation, proposes the contract risk allocation model based on engineering dynastic operation.
To avoid water damage or scalding due to valve operation, a drain pipe must be connected to the Pressure Safety Relief Valve and run to a safe place of disposal.