Truck is able to access into the coalyard at both ends. the EOT crane shall over pass the road for coal incoming.
卡车能访问入煤炭围场在EOT起重机将通行证路为煤炭接踵而来的两个结束。
2
The work volume for coal loading, unloading and distribution in coalyard of thermal power plants is very great, which needs to increase the automation degree.
火电厂煤场装车、卸车、配煤的工作量很大,迫切需要提高其自动化程度。
3
The clean coal, the key raw material of the coking plant is stored mainly in open coalyard. Such coal autoignition is a big hidden trouble to the coal storage.