In this paper, the total energy in the strained layer with nonstrained cappinglayer is calculated using continuum model.
利用连续介质模型,计算有非应变盖层的应变外延层结构中单位面积的能量。
2
During joint mining of open-pit and underground, the ground air leakage control was realized by laying the cappinglayer on the open pit.
在露天与地下联合开采时期,控制地表漏风主要通过露天坑底铺设覆盖层来实现。
3
The structures of the invention are prepared by adhering a porous dielectric layer to a substantially nonporous cappinglayer via an intermediate adhesion promoting dielectric layer.