The feasibility study is the important content in the period of the earlier constructing time, and is the constituent of the capitalconstructionprocedure.
可行性研究是建设前期工作的重要内容,是基本建设程序中的重要组成部分。
2
In order to ensure safety in nuclear power plant, must according to capitalconstructionprocedure, complete one's work of prospecting, especially give and appraisal of paraclase.
为了确保核电厂安全,应按基建程序完成勘测各阶段任务,特别是对断层的鉴定与评价。
3
Contents summary: Each item engineering construction at design and construction before, have to carry on rock soil engineering to investigate according to the capitalconstructionprocedure.